On-Holiday Parties

Sr.No Name pf party Address Reference of Contract Reason for Holiday listing
1 M/s. Inspection Syndicate of India (P) Ltd. Marshall House (8th Floor), Room No. 876-878,
33/1, Netaji Subhash Road
Kolkata – 700 001, West Bengal
W.O. No. 4500039351 dated 01.07.2014

indulgence in deliberate negligence in execution of contract

Holiday Period: 16.06.2016 - 15.06.2018

2 M/s Hemant  Parikh & Associates

703-706, Krushal  Commercial Towers, Above Shopper’s Stop, G.M. Road , Near Amar Mahal Junction, Chembur (W) Mumbai – 400 089.

Architectural Services for Re-development of RCF colony, Type I-B at Chembur, Mumbai – 400 074, during the year 2012-13. Ref: Work order No 34(Year 2012-13) dated 03/12/2012

Performance of the architect is not at all satisfactory as far as time schedule is concerned.

Period: 05/07/2016 to 04/07/2017 

3 M/s Ashtavinayak Travels Plot no 171,House No. 81, Revdanda Road, Alibag 402201 Tender ID: 2016_RCFL_92202_1 dated 20.05.16

Non-fulfillment of contractual obligation

Period: one year W.E.F. 01.07.2016

4 M/s. Jameks Engineering Pvt. Ltd SA 48, 2ND FLOOR, LAKE CITY MALL-A, KAPURBAWADI NAKA, NR. MAJIWADA FLYOVER, THANE - 400601 Tender No. DC/MB-20491 dt. 15.04.2015 for Procurement of Power Distribution Board

Non-delivery of ordered material

(For one year w.e.f. 30.08.2016)
5 EVERYWHERE TRANSPORT ORGANISATION

801-B , PRESIDENT PARK SEC.29,VASHI -400703, NAVI MUMBAI, This email address is being protected from spambots. You need JavaScript enabled to view it.
Ph.N. 022-27891108

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
7.11.2016 to 06.11.2017

6 SUN-SUN ROADWAYS

502.SAI RAJ PLOT NO 56, SECTOR 29 VASHI,NAVI MUMBAI 400705, This email address is being protected from spambots. You need JavaScript enabled to view it.

ph. No. 022-27669804

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
7.11.2016 to 06.11.2017

7 EVERYWHERE TRANSPORT ORG PVT LTD

513, CENTRAL FACILITY BLDG., FRUIT MARKET COMPLEX, SECTOR-19,VASHI - NAVI MUMBAI -400705, This email address is being protected from spambots. You need JavaScript enabled to view it.

ph. No. 022-27840856

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
19.12.2016 to 18.12.2017

8 NSS LOGISTICS (INDIA) PVT. LTD.

SHETTY HOUSE PANCHASHIL NGR, VASANT PATIL MARG SION, CHUNABHATTI MUMBAI -4000022

This email address is being protected from spambots. You need JavaScript enabled to view it.

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
18.05.2017 to 17.05.2018

9 DHANALAKHMI TRANSLINES

403, THAKUR PRASAD BLDG.,
V.N.PURAV MARG, CHUNABHATTI,
MUMBAI-400022
m.no.9821575777
This email address is being protected from spambots. You need JavaScript enabled to view it.

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
07.11.2016 to 06.11.2017

10 VARUN VAHATUK SAHAKARI SANSTHA MARYADIT

REG.NO.R.G.D. AB. GG.N.L. 301/1984
JOGLEKAR NAKA, ALIBAUG
RAIGAD MAHARASHTRA
This email address is being protected from spambots. You need JavaScript enabled to view it.
ph.no. 02141-220225/227007

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
07.11.2016 to 06.11.2017

11 SHREE SAI TRANSPORT CO.

D-61,VITTAYASANCHAYA SOCIETY
CHEMBUR MUMBAI-400074
This email address is being protected from spambots. You need JavaScript enabled to view it.
ph.no. 022-25545091

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
07.11.2016 to 06.11.2017

12 ROYAL BULK CARRIERS

B-702,GIRIRAJ DHARSHAN CHS,
PLOT NO.6, SECTOR-9, KOPERKHAIRANE,
NAVI MUMBAI-400709
This email address is being protected from spambots. You need JavaScript enabled to view it.
ph.no. 022-32197719

RCF /MKTG/LOGISTICS/14-15/Tro./Thal-Block Fert

Incorrect methodology
used while
quoting rates

Period of Holiday:
07.11.2016 to 06.11.2017

13 M/s COTECNA SINGAPORE Pte Ltd. 

9 Penang Road,

#12-08 Park Mall,

Singapore 238459 
TC:RM:PMAP:LP:SURVEYOR:FEB:2015 DATED 11.03.2015 Unsatisfactory performance. 
On holiday List  From 22/04/2016 to 21/04/2017.
14 M/s. Superintendance Co. of India Pvt. Ltd.

Laxmi Bhuvan,

1st & 2nd Floor,

161, P.D’Mello Road, Mumbai – 400 001
TC:RM:SUR:MBPT-ID & HAY BUNDER:2014-15 dated 18.04.2014 Unsatisfactory performance. 
On holiday List  From 22/04/2016 to 21/04/2017.
15 M/s. UPHAR CABLE INDUSTRIES UNIT-II

VPO BELA BATHRI, TEHSIL HAROLI, DISTT. UNA,

HIMACHAL PRADESH – 174301
Tender No. ET-2201512104 dt. 21.12.2015 for Procurement of LT Power Cables

Non-delivery of ordered material

(On holiday list for three years w.e.f. 10.12.2016)
16 M/s Ashtavinayak Enterprises 56, Krishna Kunj, Lallubhai Park Road, Andheri (W), Mumbai - 400058

Work Order Nos. :-

(1) ET-MES/338/L/1516/354A

(2) ET-MES/397/L/1516/354C &

(3) ET-MES/352/L/1516/354D dtd.22.03.2016

(4) ET- MES/307/L/1516/334 dtd.22/01/2016

For Maintenance & testing of various capacity EOTs in STP, Suphala bagging & Urea bagging plants, Suphala plant and Urea plant in RCF, Trombay unit

As M/s Ashtavinayak Enterprises did not honour and execute the work orders awarded to them For Maintenance & testing of various capacity EOTs in STP, Suphala bagging & Urea bagging plants, Suphala plant and Urea plant in RCF, Trombay unit. 

 

23.01.2017 to 22.01.2019 (Two Years period)

17 M/s Rajat Metal 469/475 Moon House, 2nd Floor, Office no.13, Duncan Road,Near Goldeval Temple,Mumbai- 400004, Maharashtra PO-4500047097 Dtd: 18/06/2016 for supply of SS material 304L Plates

Non-supply of supply of material.

Period of one year w.e.f. 09/02/2017

18 M/S NATIONAL ENTERPRISES

PLOT NO 166,LANE NO.6,SADATNAGAR RLY STATION ROAD
AURANGABAD(M.CORP) TAL:AURANGABAD,DIS:AURANGABAD
431001
Maharashtra
India

MSTC/E-AUCilON NO. 20666 DTD.05.04.2016.

Holiday Period: from 18.08.2016 to 17.08.2017

Scrap lot was sold to party through M/s MSTC and party has failed to make payment.

 19 M/S RAMLEELA

12B KAPILA HOUSING SOCIETY,GOKHALE NAGAR
PUNE(M CORP),PUNE,TALUKA:-PUNE CITY,PUNE
411016
Maharashtra
India

MSTC/E-AUCilON NO. 20666 DTD.05.04.2016.

Holiday Period: from 18.08.2016 to 17.08.2017

Scrap lot was sold to party through M/s MSTC and party has failed to make payment.
 20 M/S SADIYA ENTERPRISES

SHOP NO 44, MARATHA MANDIR ROAD, GR FLOOR STALL BMC
MUMBAI CENTRAL, MUMBAI
400008
Maharashtra
India

MSTC/E-AUCilON NO. 20666 DTD.05.04.2016.

Holiday Period: from 18.08.2016 to 17.08.2017

Scrap lot was sold to party through M/s MSTC and party has failed to make payment.
21 M/s Ultracab (India) Ltd Survey No.262, Behind Galaxy bearings Ltd, Shapar (Veraval), Dist-Rajkot-360024, Gujarat

Tender No:ET-2201608001 for   Supply of Power cable      

on Holiday upto 10.03.2018

Not accepted the rate quoted during e-reverse auction.
22 M/s Sagar Transport A.P.M.C Weigh Bridge, Market Yard, Belagavi

W. O. No.
RCF/Mktg/KNT/HBL/H & T 15-16,
Dated: 12.01.2016

Attempt to limit the spirit of competition by filling up of the rates for the two common firms by one person.
Holiday Period from 09.03.2017 to 08.03.2018

23 M/s Servo Packagings Limited

32, Ezra Street (Suit No. 704),

Kolkatta – 700 001, West Bengal

P.O. No. 4500047012 dated 26.05.2016

Holiday Period: 25.05.2017 to 24.05.2020

rejection of 25% in the ordered quantity on account of standard/specification in a six monthly contract
24 M/s Piyush Enterprise 

113/114,Shubhlaxmi Shopping Centre,

Sector-09,Vasant Nagari,

Vasai (E) , Palghar,

Thane -401205.

RCF/TR/CES/TS/ Road - repairs/2016-17/CES-64

Discrepancies in PQC  documents.

Period of Holiday :- One Year from 14.12.2016  i.e. up to 13/12/2017.
25 Shreenath Transport  Co.

Shri Krushna Nagar
Near Pathya Pustak Office
Pravin Nagar,Amravati,(M.S.)444603

Ref.no.Mktg/H&T/Badnera/2016

Disipanalary Action
Period of Holiday:
03.01.2017 to 02.01.2018

26

Satyam Roadways
Govt.Transport Contractor

1,Mehsana Jilla Sangh Complex,
Near Swaminarayan Temple
Opp.Gayatri Temple Highway
Mehesana 384002 (Gujrat State)

Ref.No.Mktg./H&T/Guj/Ranoli/2016-17

Incorrect methodology used while
quoting rates
Period of Holiday:
04.05.2017 to 03.05.2018

27

Sundaram Road Lines,
Govt.Transport Contractor

E-9 Tarun Nagar So.Part-3,
Swaminarayan Baug
Memnagar Ahmedabad (GujratState)

Ref.No.Mktg./H&T/Guj/Ranoli/2016-17

Incorrect methodology used while
quoting rates
Period of Holiday:
04.05.2017 to 03.05.2018

28 M/s Swati Enterprises

8, Vijay Kiran Apartment, Tidke Colony, Nashik
Maharashtra- 422002

P.O No 4500046794 for   Supply of  MCC Panel

Not Supplied the ordered material.

Period of Holiday :
30/05/2017 to 29/05/2020