The revamp scheme is based on End-to-End survey conducted by M/s Casale SA, Switzerland. The project has been taken-up with following objectives:

1- Reduction in specific energy consumption of Urea.

2- Plant capacity: 1350 MTPD on sustained basis.

3- Improving the waste water quality to Boiler Feed Water grade.

The revamp scheme is envisaged to result in energy saving of 0.19 Gcal/MT of Urea. Estimated project capital cost is about Rs.137.03 Crore and work is under execution.Expected project completion by Apr’20.